Source: https://www.bankofengland.co.uk/-/media/boe/files/prudential-regulation/policy-statement/2026/january/ps126app1.pdf · captured 2026-09-29 · checked 2026-09-29 · c75b8196

Page 279 thumbnail
14746 This document is effective from 1 January 2027 to accompany PS1/26.
14747Please see: www.bankofengland.co.uk/prudential-regulation/publication/2026/january/implementation-of-basel-3-1-final-rules-policy-statement.
14748 PRA2026/1
14750 5. In developing the extreme scenarios of future shocks in accordance with paragraph 3 an
14751 institution shall ensure that the extreme scenarios of future shock adequately consider any
14752 limitations to the methodologies used, including but not limited to:
14753 (a) any skewness or kurtosis in the distribution of returns on the non-modellable risk factor;
14754 and
14755 (b) any material non-linearity in the institution’s portfolio with respect to that non-modellable
14756 risk factor.
14757 Conceptually, an institution shall estimate the confidence interval around the extreme scenarios
14758 of future shocks produced by their methodologies due to the methodological limitations, and
14759 ensure that the extreme scenarios of future shocks used are at the conservative end of that
14760 confidence interval.
14761 6. Where an institution determines the extreme scenarios of future shock based on a proxy risk
14762 factor, the institution shall demonstrate that that proxy results in a stress scenario risk measure
14763 that meets the conditions in paragraph 3 with a high degree of confidence. Where an institution
14764 determines the extreme scenarios of future shock indirectly by scaling to the stress period a
14765 risk measure calibrated to another period of time, the institution shall demonstrate that the
14766 scalar is generally appropriate for the non-modellable risk factors to which it is applied and
14767 results in stress scenario risk measures that meet the conditions in paragraph 3 with a high
14768 degree of confidence.
14769 Development of extreme scenarios of future shock at standardised bucket level
14770 7. By way of derogation from paragraph 3, where an institution has simultaneously assessed the
14771 modellability of more than one non-modellable risk factor by assessing the modellability of a
14772 single standardised bucket in accordance with Article 325be, the institution may instead
14773 develop joint extreme scenarios of future shock for all risk factors in that single standardised
14774 bucket for the purposes of paragraph 2 such that the resulting stress scenario risk measure is
14775 at least as conservative as:
14776 (a) an expected shortfall measure calculated for non-modellable risk factors included in that
14777 standardised bucket only;
14779 (b) for the stress period in accordance with paragraph 10;
14781 (c) at 97.5 th percentile, one tailed confidence interval;
14783 (d) calculated with base time horizon of 10 days; and
14785 (e) scaled to a time horizon that is the greater of 20 days and the liquidity horizon of that non-
14786 modellable risk factor in accordance with the following formula:
14788 𝑚𝑎𝑥(20, 𝐿𝐻 𝑗 )
14789 𝑆𝑆 𝑗 = 𝑆𝑆 𝑗 (𝑇)√
14792 Where:
14794 𝑆𝑆 𝑗 = the standalone expected shortfall measure of the non-modellable risk factors in
14795 standardised bucket j
14797 𝐿𝐻 𝑗 = the liquidity horizon of the non-modellable risk factors in standardised bucket j, as
14798 set out in Article 325bd
14800 𝑇= the base time horizon, where T = 10 days
14802 Page 279 of 492