7631 This document is effective from 1 January 2027 to accompany PS1/26.
7632Please see: www.bankofengland.co.uk/prudential-regulation/publication/2026/january/implementation-of-basel-3-1-final-rules-policy-statement.
7633 PRA2026/1
7635 Government Project of strategic Project considered Project may not be Project not key to the
7636 support and importance for the important for the strategic but brings country. No or weak
7637 project’s importance country (preferably country. Good level unquestionable support from
7638 for the country over export-oriented). of support from benefits for the Government.
7639 the long term. Strong support from Government. country. Support
7640 Government. from Government
7641 may not be explicit.
7643 Stability of legal and Favourable and Favourable and Regulatory changes Current or future
7644 regulatory stable regulatory stable regulatory can be predicted regulatory issues may
7645 environment (risk of environment over environment over with a fair level of affect the project.
7646 change in law). the long term. the medium term. certainty.
7648 Acquisition of all Strong. Satisfactory. Fair. Weak.
7649 necessary supports
7650 and approvals for
7651 such relief from
7652 local content laws.
7654 Enforceability of Contracts, collateral Contracts, collateral Contracts, collateral There are unresolved
7655 contracts, collateral and security are and security are and security are key issues in respect of
7656 and security. enforceable. enforceable. considered actual enforcement of
7657 enforceable even if contracts, collateral and
7658 certain non-key security.
7659 issues may exist.
7660 Transaction characteristics
7661 Design and Fully proven Fully proven Proven technology Unproven technology
7662 technology risk. technology and technology and and design — start- and design; technology
7663 design. design. up issues are issues exist and/or
7664 mitigated by a complex design.
7665 strong completion
7666 package.
7668 Construction risk
7669 Permitting and All permits have Some permits are Some permits are Key permits still need
7670 siting. been obtained. still outstanding but still outstanding but to be obtained and are
7671 their receipt is the permitting not considered routine.
7672 considered very process is well Significant conditions
7673 likely. defined and they may be attached.
7674 are considered
7675 routine
7677 Type of construction Fixed-price date- Fixed-price date- Fixed-price date- No or partial fixed-
7678 contract. certain turnkey certain turnkey certain turnkey price turnkey contract
7679 construction EPC construction EPC. construction and/or interfacing
7680 (engineering and contract with one or issues with multiple
7681 procurement several contractors. contractors.
7682 contract).
7684 Completion Substantial Significant Adequate liquidated Inadequate liquidated
7685 guarantees. liquidated damages liquidated damages damages supported damages or not
7686 supported by supported by by financial supported by financial
7687 financial substance financial substance substance and/or substance or weak
7688 and/or strong and/or completion completion completion
7689 completion guarantee from guarantee from guarantees.
7690 guarantee from sponsors with good sponsors with good
7691 sponsors with financial standing. financial standing.
7692 excellent financial
7693 standing.
7695 Page 150 of 492