Source: https://www.bankofengland.co.uk/-/media/boe/files/prudential-regulation/policy-statement/2026/january/ps126app1.pdf · captured 2026-09-29 · checked 2026-09-29 · c75b8196

Page 149 thumbnail
7569 This document is effective from 1 January 2027 to accompany PS1/26.
7570Please see: www.bankofengland.co.uk/prudential-regulation/publication/2026/january/implementation-of-basel-3-1-final-rules-policy-statement.
7571 PRA2026/1
7573 List 2: Supervisory rating grades for project finance exposures
7575 Rating grades → Strong Good Satisfactory Weak
7577 Factors 
7578 Financial strength
7579 Market conditions. Few competing Few competing Project has no Project has worse than
7580 suppliers or suppliers or better advantage in average location, cost,
7581 substantial and than average location, cost, or or technology. Demand
7582 durable advantage location, cost, or technology. is weak and declining.
7583 in location, cost, or technology but this Demand is
7584 technology. situation may not adequate and
7585 Demand is strong last. Demand is stable.
7586 and growing. strong and stable.
7588 Financial ratios (eg Strong financial Strong to Standard financial Aggressive financial
7589 debt service ratios considering acceptable financial ratios considering ratios considering the
7590 coverage ratio the level of project ratios considering the level of project level of project risk.
7591 (DSCR), loan life risk; very robust the level of project risk.
7592 coverage ratio economic risk; robust project
7593 (LLCR), project life assumptions. economic
7594 coverage ratio assumptions.
7595 PLCR), and debt-to-
7596 equity ratio).
7598 Stress analysis. The project can The project can The project is The project is likely to
7599 meet its financial meet its financial vulnerable to default unless
7600 obligations under obligations under stresses that are conditions improve
7601 sustained, severely normal stressed not uncommon soon.
7602 stressed economic economic or through an
7603 or sectoral sectoral conditions. economic cycle,
7604 conditions. The project is only and may default in a
7605 likely to default normal downturn.
7606 under severe
7607 economic
7608 conditions.
7609 Financial structure
7610 Duration of the Useful life of the Useful life of the Useful life of the Useful life of the project
7611 credit compared to project significantly project exceeds project exceeds may not exceed tenor of
7612 the duration of the exceeds tenor of tenor of the loan. tenor of the loan. the loan.
7613 project. the loan.
7615 Amortisation Amortising debt. Amortising debt. Amortising debt Bullet repayment or
7616 schedule. repayments with amortising debt
7617 limited bullet repayments with high
7618 payment. bullet repayment.
7619 Political and legal environment
7620 Political risk, Very low exposure; Low exposure; Moderate exposure; High exposure; no or
7621 including transfer strong mitigation satisfactory fair mitigation weak mitigation
7622 risk, considering instruments, if mitigation instruments. instruments.
7623 project type and needed. instruments, if
7624 mitigants. needed.
7626 Force majeure risk Low exposure. Acceptable Standard protection. Significant risks, not
7627 (war, civil unrest, exposure. fully mitigated.
7628 etc).
7630 Page 149 of 492