Source: https://www.bankofengland.co.uk/-/media/boe/files/prudential-regulation/policy-statement/2026/january/ps126app1.pdf · captured 2026-09-29 · checked 2026-09-29 · c75b8196

Page 151 thumbnail
7696 This document is effective from 1 January 2027 to accompany PS1/26.
7697Please see: www.bankofengland.co.uk/prudential-regulation/publication/2026/january/implementation-of-basel-3-1-final-rules-policy-statement.
7698 PRA2026/1
7700 Track record and Strong. Good. Satisfactory. Weak.
7701 financial strength of
7702 contractor in
7703 constructing similar
7704 projects.
7705 Operating risk
7706 Scope and nature of Strong long-term Long-term O&M Limited O&M No O&M contract: risk
7707 operations and O&M contract, contract, and/or contract or O&M of high operational
7708 maintenance (O&M) preferably with O&M reserve reserve account. cost overruns beyond
7709 contracts. contractual accounts. mitigants.
7710 performance
7711 incentives, and/or
7712 O&M reserve
7713 accounts.
7715 Operator’s Very strong or Strong. Acceptable. Limited/weak or local
7716 expertise, track committed technical operator dependent on
7717 record, and financial assistance of the local authorities.
7718 strength. sponsors.
7719 Off-take risk
7720 If there is a take-or- Excellent Good Acceptable financial Weak off-taker; weak
7721 pay or fixed-price creditworthiness of creditworthiness of standing of off- termination clauses;
7722 off-take contract: off-taker; strong off-taker; strong taker; normal tenor of contract does
7723 termination clauses; termination clauses; termination clauses; not exceed the
7724 tenor of contract tenor of contract tenor of contract maturity of the debt.
7725 comfortably exceeds the generally matches
7726 exceeds the maturity of the debt. the maturity of the
7727 maturity of the debt. debt.
7729 If there is no take- Project produces Project produces Commodity is sold Project output is
7730 or-pay or fixed-price essential services or essential services on a limited market demanded by only one
7731 off-take contract: a commodity sold or a commodity sold that may absorb it or a few buyers or is
7732 widely on a world widely on a regional only at lower than not generally sold on
7733 market; output can market that will projected prices. an organised market.
7734 readily be absorbed absorb it at
7735 at projected prices projected prices at
7736 even at lower than historical growth
7737 historic market rates.
7738 growth rates.
7739 Supply risk
7740 Price, volume and Long-term supply Long-term supply Long-term supply Short-term supply
7741 transportation risk of contract with contract with contract with contract or long-term
7742 feed-stocks; supplier of excellent supplier of good supplier of good supply contract with
7743 supplier’s track financial standing. financial standing. financial standing — financially weak
7744 record and financial a degree of price supplier — a degree of
7745 strength. risk may remain. price risk definitely
7746 remains.
7748 Reserve risks (eg Independently Independently Proven reserves Project relies to some
7749 natural resource audited, proven and audited, proven and can supply the extent on potential and
7750 development). developed reserves developed reserves project adequately undeveloped reserves.
7751 well in excess of in excess of through the maturity
7752 requirements over requirements over of the debt.
7753 lifetime of the lifetime of the
7754 project. project.
7756 Page 151 of 492