Source: https://www.bankofengland.co.uk/-/media/boe/files/prudential-regulation/policy-statement/2026/january/ps126app1.pdf · captured 2026-09-29 · checked 2026-09-29 · c75b8196
12862 This document is effective from 1 January 2027 to accompany PS1/26.
12863Please see: www.bankofengland.co.uk/prudential-regulation/publication/2026/january/implementation-of-basel-3-1-final-rules-policy-statement.
12866 (b) in calculating:
12870 an institution shall only apply scenarios of future shocks to the subset of the modellable
12871 risk factors of the positions in the portfolio chosen by the institution for the purposes of
12872 point (a) of this paragraph and which have been mapped to the broad risk factor category
12873 ‘i’ in accordance with Article 325bd;
12875 (c) the data inputs used to determine the scenarios of future shocks applied to the modellable
12876 risk factors referred to in points (a) and (b) shall be calibrated to historical data from a
12877 continuous 12-month period of financial stress that shall be identified by the institution in
12878 order to maximise the value of:
12882 and for the purpose of identifying that stress period, an institution shall use an appropriate
12883 observation period starting at least from 1 January 2007. The institution shall assess the
12884 appropriateness of the stress period at each quarterly reporting reference date and shall
12885 adjust the stress period as necessary; and
12887 (d) the data inputs of:
12891 shall be calibrated to the 12-month stress period that has been identified by the institution
12892 for the purposes of point (c).
12894 3. For the purpose of calculating the partial expected shortfall measures:
12901 referred to in Article 325bb(1), an institution shall, in addition to the requirements set out in
12902 paragraph 1, meet the following requirements:
12903 (a) in calculating:
12906 an institution shall only apply scenarios of future shocks to the subset of the modellable
12907 risk factors of the positions in the portfolio referred to in point (a) of paragraph 2;
12909 (b) in calculating:
12912 an institution shall only apply scenarios of future shocks to the subset of the modellable
12913 risk factors of the positions in the portfolio referred to in point (b) of paragraph 2;
12915 (c) the data inputs used to determine the scenarios of future shocks applied to the modellable
12916 risk factors referred to in points (a) and (b) of this paragraph shall be calibrated to historical