4401Contracts, collateral and security are enforceable.
4402
4403Contracts, collateral and security are enforceable.
4404
4405Contracts, collateral and security are considered enforceable even if certain non-key issues may exist.
4406
4407There are unresolved key issues in respect of actual enforcement of contracts, collateral and security.
4408
4409Transaction characteristics
4410
4411Design and technology risk.
4412
4413Fully proven technology and design.
4414
4415Fully proven technology and design.
4416
4417Proven technology and design — start-up issues are mitigated by a strong completion package.
4418
4419Unproven technology and design; technology issues exist and/or complex design.
4420
4421Construction risk
4422
4423Permitting and siting.
4424
4425All permits have been obtained.
4426
4427Some permits are still outstanding but their receipt is considered very likely.
4428
4429Some permits are still outstanding but the permitting process is well defined and they are considered routine
4430
4431Key permits still need to be obtained and are not considered routine. Significant conditions may be attached.
4432
4433Type of construction contract.
4434
4435Fixed-price date-certain turnkey construction EPC (engineering and procurement contract).
4436
4437Fixed-price date-certain turnkey construction EPC.
4438
4439Fixed-price date-certain turnkey construction contract with one or several contractors.
4440
4441No or partial fixed-price turnkey contract and/or interfacing issues with multiple contractors.
4442
4443Completion guarantees.
4444
4445Substantial liquidated damages supported by financial substance and/or strong completion guarantee from sponsors with excellent financial standing.
4446
4447Significant liquidated damages supported by financial substance and/or completion guarantee from sponsors with good financial standing.
4448
4449Adequate liquidated damages supported by financial substance and/or completion guarantee from sponsors with good financial standing.
4450
4451Inadequate liquidated damages or not supported by financial substance or weak completion guarantees.
4452
4453Track record and financial strength of contractor in constructing similar projects.
4454
4455Strong.
4456
4457Good.
4458
4459Satisfactory.
4460
4461Weak.
4462
4463Operating risk
4464
4465Scope and nature of operations and maintenance (O&M) contracts.
4466
4467Strong long-term O&M contract, preferably with contractual performance incentives, and/or O&M reserve accounts.
4468
4469Long-term O&M contract, and/or O&M reserve accounts.
4470
4471Limited O&M contract or O&M reserve account.
4472
4473No O&M contract: risk of high operational cost overruns beyond mitigants.
4474
4475Operator’s expertise, track record, and financial strength.
4476
4477Very strong or committed technical assistance of the sponsors.
4478
4479Strong.
4480
4481Acceptable.
4482
4483Limited/weak or local operator dependent on local authorities.
4484
4485Off-take risk
4486
4487If there is a take-or-pay or fixed-price off-take contract:
4488
4489Excellent creditworthiness of off-taker; strong termination clauses; tenor of contract comfortably exceeds the maturity of the debt.
4490
4491Good creditworthiness of off-taker; strong termination clauses; tenor of contract exceeds the maturity of the debt.
4492
4493Acceptable financial standing of off-taker; normal termination clauses; tenor of contract generally matches the maturity of the debt.
4494
4495Weak off-taker; weak termination clauses; tenor of contract does not exceed the maturity of the debt.
4496
4497If there is no take-or-pay or fixed-price off-take contract:
4498
4499Project produces essential services or a commodity sold widely on a world market; output can readily be absorbed at projected prices even at lower than historic market growth rates.
4500