4301Project has no advantage in location, cost, or technology. Demand is adequate and stable.
4302
4303Project has worse than average location, cost, or technology. Demand is weak and declining.
4304
4305Financial ratios (eg debt service coverage ratio (DSCR), loan life coverage ratio (LLCR), project life coverage ratio PLCR), and debt-to-equity ratio).
4306
4307Strong financial ratios considering the level of project risk; very robust economic assumptions.
4308
4309Strong to acceptable financial ratios considering the level of project risk; robust project economic assumptions.
4310
4311Standard financial ratios considering the level of project risk.
4312
4313Aggressive financial ratios considering the level of project risk.
4314
4315Stress analysis.
4316
4317The project can meet its financial obligations under sustained, severely stressed economic or sectoral conditions.
4318
4319The project can meet its financial obligations under normal stressed economic or sectoral conditions. The project is only likely to default under severe economic conditions.
4320
4321The project is vulnerable to stresses that are not uncommon through an economic cycle, and may default in a normal downturn.
4322
4323The project is likely to default unless conditions improve soon.
4324
4325Financial structure
4326
4327Duration of the credit compared to the duration of the project.
4328
4329Useful life of the project significantly exceeds tenor of the loan.
4330
4331Useful life of the project exceeds tenor of the loan.
4332
4333Useful life of the project exceeds tenor of the loan.
4334
4335Useful life of the project may not exceed tenor of the loan.
4336
4337Amortisation schedule.
4338
4339Amortising debt.
4340
4341Amortising debt.
4342
4343Amortising debt repayments with limited bullet payment.
4344
4345Bullet repayment or amortising debt repayments with high bullet repayment.
4346
4347Political and legal environment
4348
4349Political risk, including transfer risk, considering project type and mitigants.
4350
4351Very low exposure; strong mitigation instruments, if needed.
4352
4353Low exposure; satisfactory mitigation instruments, if needed.
4354
4355Moderate exposure; fair mitigation instruments.
4356
4357High exposure; no or weak mitigation instruments.
4358
4359Force majeure risk (war, civil unrest, etc).
4360
4361Low exposure.
4362
4363Acceptable exposure.
4364
4365Standard protection.
4366
4367Significant risks, not fully mitigated.
4368
4369Government support and project’s importance for the country over the long term.
4370
4371Project of strategic importance for the country (preferably export-oriented). Strong support from Government.
4372
4373Project considered important for the country. Good level of support from Government.
4374
4375Project may not be strategic but brings unquestionable benefits for the country. Support from Government may not be explicit.
4376
4377Project not key to the country. No or weak support from Government.
4378
4379Stability of legal and regulatory environment (risk of change in law).
4380
4381Favourable and stable regulatory environment over the long term.
4382
4383Favourable and stable regulatory environment over the medium term.
4384
4385Regulatory changes can be predicted with a fair level of certainty.
4386
4387Current or future regulatory issues may affect the project.
4388
4389Acquisition of all necessary supports and approvals for such relief from local content laws.
4390
4391Strong.
4392
4393Satisfactory.
4394
4395Fair.
4396
4397Weak.
4398
4399Enforceability of contracts, collateral and security.
4400