4301 Project has no advantage in location, cost, or technology. Demand is adequate and stable.
4303 Project has worse than average location, cost, or technology. Demand is weak and declining.
4305 Financial ratios (eg debt service coverage ratio (DSCR), loan life coverage ratio (LLCR), project life coverage ratio PLCR), and debt-to-equity ratio).
4307 Strong financial ratios considering the level of project risk; very robust economic assumptions.
4309 Strong to acceptable financial ratios considering the level of project risk; robust project economic assumptions.
4311 Standard financial ratios considering the level of project risk.
4313 Aggressive financial ratios considering the level of project risk.
4317 The project can meet its financial obligations under sustained, severely stressed economic or sectoral conditions.
4319 The project can meet its financial obligations under normal stressed economic or sectoral conditions. The project is only likely to default under severe economic conditions.
4321 The project is vulnerable to stresses that are not uncommon through an economic cycle, and may default in a normal downturn.
4323 The project is likely to default unless conditions improve soon.
4327 Duration of the credit compared to the duration of the project.
4329 Useful life of the project significantly exceeds tenor of the loan.
4331 Useful life of the project exceeds tenor of the loan.
4333 Useful life of the project exceeds tenor of the loan.
4335 Useful life of the project may not exceed tenor of the loan.
4337 Amortisation schedule.
4343 Amortising debt repayments with limited bullet payment.
4345 Bullet repayment or amortising debt repayments with high bullet repayment.
4347 Political and legal environment
4349 Political risk, including transfer risk, considering project type and mitigants.
4351 Very low exposure; strong mitigation instruments, if needed.
4353 Low exposure; satisfactory mitigation instruments, if needed.
4355 Moderate exposure; fair mitigation instruments.
4357 High exposure; no or weak mitigation instruments.
4359 Force majeure risk (war, civil unrest, etc).
4367 Significant risks, not fully mitigated.
4369 Government support and project’s importance for the country over the long term.
4371 Project of strategic importance for the country (preferably export-oriented). Strong support from Government.
4373 Project considered important for the country. Good level of support from Government.
4375 Project may not be strategic but brings unquestionable benefits for the country. Support from Government may not be explicit.
4377 Project not key to the country. No or weak support from Government.
4379 Stability of legal and regulatory environment (risk of change in law).
4381 Favourable and stable regulatory environment over the long term.
4383 Favourable and stable regulatory environment over the medium term.
4385 Regulatory changes can be predicted with a fair level of certainty.
4387 Current or future regulatory issues may affect the project.
4389 Acquisition of all necessary supports and approvals for such relief from local content laws.
4399 Enforceability of contracts, collateral and security.