Source: https://www.bankofengland.co.uk/-/media/boe/files/prudential-regulation/policy-statement/2026/january/ps126app1.pdf · captured 2026-09-29 · checked 2026-09-29 · c75b8196
Changes as marked in the source: {+underlined text is inserted+}, [-struck-through text is deleted-].
24936 This document is effective from 1 January 2027 to accompany PS1/26.
24937Please see: www.bankofengland.co.uk/prudential-regulation/publication/2026/january/implementation-of-basel-3-1-final-rules-policy-statement.
24940 {+(iv) a description of the approaches used for back-testing and validating the accuracy and+}
24941 {+consistency of the internal models and modelling processes;+}
24943 {+(b) the scope of permission by the PRA;+}
24945 {+(c) a description of the extent and methodologies for compliance with the requirements set out+}
24946 {+in Trading Book (CRR) Part Articles 104 and 105;+}
24948 {+(d) the highest, the lowest and the mean of the following:+}
24950 {+(i) the daily value-at-risk measures over the reporting period and at the end of the+}
24951 {+reporting period;+}
24953 {+(ii) the stressed value-at-risk measures over the reporting period and at the end of the+}
24954 {+reporting period;+}
24956 {+(iii) the risk numbers for incremental default and migration risk and for the specific risk of+}
24957 {+the correlation trading portfolio over the reporting period and at the end of the+}
24958 {+reporting period;+}
24960 {+(e) the elements of the own funds requirement as specified in Market Risk: Internal Model+}
24961 {+Approach (CRR) Part Article 364;+}
24963 {+(f) the weighted average liquidity horizon for each sub-portfolio covered by the internal+}
24964 {+models for incremental default and migration risk and for correlation trading; and+}
24966 {+(g) a comparison of the daily end-of-day value-at-risk measures to the one-day changes of the+}
24967 {+portfolio's value by the end of the subsequent business day together with an analysis of+}
24968 {+any important overshooting during the reporting period.+}
24970 {+[Note: This rule corresponds to Article 455 of the CRR as it applied immediately before revocation by+}
24972 {+7.4 An institution shall make the disclosures required by point (b) of 7.2 in accordance with:+}
24973 {+(a) the relevant instructions in Annex XXX as set out in point (d) of 7.5; and+}
24975 {+(b) Title I of Chapter 4 and Article 20 of Chapter 5 with the following modifications:+}
24977 {+(i) a reference to Article 455 or Title III of Chapter 4 shall be a reference to 7.3; and+}
24979 {+(ii) a reference to Chapter 5 shall be a reference to 7.2.+}
24981 {+7.5 (a) Table UK MRB can be found here.+}
24982 {+(b) Template UK MR2-A can be found here.+}
24984 {+(c) Template UK MR2-B can be found here.+}
24986 {+(d) Template UK MR3 can be found here.+}
24988 {+(e) Template UK MR4 can be found here.+}
24990 {+(f) Annex XXX can be found here.+}
24992 {+7.6 Following the end of the IMA transitional period, an institution which had an IMA transitional+}
24993 {+permission shall make the disclosures in accordance with 7.2 and 7.3 to the extent that those+}
24994 {+disclosures relate to the IMA transitional period and remain outstanding.+}