Source: https://www.bankofengland.co.uk/-/media/boe/files/prudential-regulation/policy-statement/2026/january/ps126app1.pdf · captured 2026-09-29 · checked 2026-09-29 · c75b8196

Page 289 thumbnail
15280 This document is effective from 1 January 2027 to accompany PS1/26.
15281Please see: www.bankofengland.co.uk/prudential-regulation/publication/2026/january/implementation-of-basel-3-1-final-rules-policy-statement.
15282 PRA2026/1
15284 Annex 2
15286 MATERIAL CHANGES AND EXTENSIONS TO INTERNAL MODELS
15288 Part A Material Changes and Extensions
15289 1. For the purpose of Article 325azx(1), a change or extension to the use of internal models shall
15290 be considered material if it fulfils any of the following conditions:
15291 (a) it is an extension which is:
15293 (i) an extension of the market risk model to an additional location in another jurisdiction,
15294 including extending the market risk model to the positions of a desk located in a
15295 different time zone, or for which different front office or IT systems are used;
15297 (ii) integration in the scope of an internal model of product classes, for which the ES
15298 number, computed according to point (a)(i) of Article 325ba(1), exceeds 5% of the ES
15299 number, computed according to point (a)(i) of Article 325ba(1), of the total portfolio
15300 forming the scope of that internal model before the integration; or
15302 (iii) a reversion in approach where the institution seeks to limit or reduce the scope of
15303 application of an IMA permission a permission to use internal models;
15305 (b) it is a change which is:
15307 (i) a change between historical simulation, parametric or Monte Carlo ES;
15309 (ii) a change in the aggregation scheme such as where a simple summation of risk
15310 numbers is replaced by integrated modelling;
15312 (c) it is a change or extension which results in a change in absolute value of 1% or more,
15313 computed for the first business day of the testing of the impact of the extension or change,
15314 of one of the relevant risk numbers referred to in point (a)(i) of Article 325ba(1), or point
15315 (a)(ii) of Article 325ba(1), or point (a) of Article 325ba(2); and associated with the scope of
15316 application of the relevant internal models to which the risk number refers; and results in
15317 either of the following:
15319 (i) a change of 5% or more of the sum of the risk numbers referred to in point (b) of
15320 Article 325ba(1), as applicable, computed at the level of the CRR consolidation entity
15321 or, in the case of an institution which is neither a parent institution nor a subsidiary, at
15322 the level of that institution; or
15324 (ii) a change of 10% or more of one or more of the relevant risk numbers referred to in
15325 point (a)(i) of Article 325ba(1), point (a)(ii) of Article 325ba(1), or point (a) of Article
15326 325ba(2) and associated with the scope of application of the relevant internal models
15327 to which the risk number refers.
15329 2. In accordance with Article 325azx(1), an institution shall assess the impact of any change or
15330 extension as the highest absolute value over the period referred to in paragraph 3 of a ratio
15331 calculated as follows:
15332 (a) for the purpose of point (c)(i) of paragraph 1 of this Annex:
15334 (i) in the numerator, the difference between the sum referred to in point (c)(i) of
15335 paragraph 1 with and without the change or extension; and
15337 Page 289 of 492