Source: https://www.bankofengland.co.uk/-/media/boe/files/prudential-regulation/policy-statement/2026/january/ps126app1.pdf · captured 2026-09-29 · checked 2026-09-29 · c75b8196
13678 This document is effective from 1 January 2027 to accompany PS1/26.
13679Please see: www.bankofengland.co.uk/prudential-regulation/publication/2026/january/implementation-of-basel-3-1-final-rules-policy-statement.
13682 (d) 30 overshootings for the value-at-risk number, calculated at a 97.5th percentile one tailed-
13683 confidence interval on the basis of back-testing of the actual changes in the value of the
13686 4. An institution shall count daily overshootings in accordance with the following:
13687 (a) it shall base the back-testing of hypothetical changes in the value of the portfolio on a
13688 comparison between the end-of-day value of the portfolio and, assuming unchanged
13689 positions, the value of the portfolio at the end of the subsequent day;
13691 (b) it shall base the back-testing of actual changes in the value of the portfolio on a
13692 comparison between the end-of-day value of the portfolio and its actual value at the end of
13693 the subsequent day, excluding fees and commissions; and
13695 (c) it shall count an overshooting for each business day for which the institution is not able to
13696 assess the value of the portfolio or is not able to calculate the value-at-risk number
13697 referred to in paragraph 3.
13699 5. An institution shall calculate, in accordance with paragraphs 6 and 7, the multiplication factor
13700 (m c ) referred to in Article 325ba for the portfolio of all the positions assigned to the trading
13701 desks for which it has been granted an IMA permission.
13702 6. An institution shall calculate the multiplication factor (m c ) as the sum of the value of 1.5 and an
13703 add-on between 0 and 0.5 in accordance with Table 3. For the portfolio referred to in
13704 paragraph 5, the institution shall calculate that add-on on the basis of the number of
13705 overshootings that occurred over the most recent 250 business days as evidenced by the
13706 institution's back-testing of the value-at-risk number calculated in accordance with point (a) of
13707 this paragraph. The institution’s calculation of the add-on shall be subject to the following
13709 (a) an overshooting shall be a one-day change in the portfolio's value that exceeds the related
13710 value-at-risk number calculated by the institution's internal model in accordance with the
13713 (i) a one-day holding period;
13715 (ii) a 99th percentile, one tailed confidence interval;
13717 (iii) scenarios of future shocks shall apply to the risk factors of the trading desks' positions
13718 referred to in Article 325bg(3) and which are considered modellable in accordance
13719 with Article 325be;
13721 (iv) the data inputs used to determine the scenarios of future shocks applied to the
13722 modellable risk factors shall be calibrated to historical data referred to in point (c) of
13725 (v) unless stated otherwise in this Article, the institution's internal model shall be based
13726 on the same modelling assumptions as those used for the calculation of the expected
13727 shortfall risk measure referred to in point (a) of Article 325ba(1);
13729 (b) the number of overshootings shall be equal to the greater of the number of overshootings
13730 under hypothetical and the actual changes in the value of the portfolio.