10111 This document is effective from 1 January 2027 to accompany PS1/26.
10112Please see: www.bankofengland.co.uk/prudential-regulation/publication/2026/january/implementation-of-basel-3-1-final-rules-policy-statement.
10113 PRA2026/1
10115 (ii) it is responsible for designing and implementing the institution’s risk-management
10116 system;
10118 (iii) it produces and analyses daily reports on the output of the internal risk-measurement
10119 model and on the appropriate measures to be taken in terms of position limits;
10121 (c) the daily reports produced by the risk-control unit are reviewed by a member of senior
10122 management with sufficient authority to enforce reductions of positions taken and of
10123 overall risk exposure;
10125 (d) the institution has sufficient staff skilled in the use of sophisticated models in the risk
10126 control unit;
10128 (e) the institution has established procedures for monitoring and ensuring compliance with a
10129 documented set of internal policies and controls concerning the overall operation of the
10130 risk-measurement system;
10132 (f) the institution’s models have a proven track record of reasonable accuracy in measuring
10133 risks demonstrated through the back-testing of its output using at least one year of data;
10135 (g) the institution frequently conducts a rigorous programme of stress testing and the results
10136 of these tests are reviewed by senior management and reflected in the policies and limits it
10137 sets;
10139 (h) the institution conducts, as part of its regular internal auditing process, an independent
10140 review of its risk-measurement system. This review shall include both the activities of the
10141 business trading units and of the independent risk-control unit;
10143 (i) at least once a year, the institution conducts a review of its risk-management system;
10145 (j) the institution’s approach meets the requirements set out in paragraphs 8 and 9 of Article
10146 292 and Article 294 of CRR;
10148 (k) where the approach is to be used for transactions covered by an eligible master netting
10149 agreement, the institution’s system for managing the risks arising from those transactions
10150 is conceptually sound and implemented with integrity.
10153 (a) An institution’s internal risk-measurement model shall capture a sufficient number of risk
10154 factors in order to capture all material price risks.
10156 (b) An institution using empirical correlations within risk categories and across risk categories
10157 shall have a system for measuring correlations that is sound and implemented with
10158 integrity.
10160 6. An institution with an SFT VaR Method Permission shall calculate ∗ i n accordance with the
10162 following formula:
10164 ∗
10165 E = max {0 , (∑ E i − ∑ C i ) + potential change in value}
10166 i i
10168 where:
10170 E i = the exposure value for each separate exposure i under the master netting agreement (or
10171 the exposure if there is no master netting agreement) that would apply in the absence of