Source: https://www.prarulebook.co.uk/pra-rules/market-risk-internal-model-approach-crr/01-01-2027?p=1 · captured 2026-09-28 · checked 2026-09-28 · b65a8e4d

2801
2802(a) Article 325bg (profit and loss attribution requirement);
2803
2804(b) Article 325bh (requirements on risk measurement); and
2805
2806(c) Article 325bi (qualitative requirements).
2807
280801/01/2027
2809
28107.
2811
2812For trading desks that have been assigned at least one of the trading book positions referred to in Article 325bl, the institution must certify that it meets the requirements set out in Article 325bm for the internal default risk model.
2813
281401/01/2027
2815
2816Annex 2
2817
2818Material Changes and Extensions to Internal Models
2819
2820Part A Material Changes and Extensions
2821
28221.
2823
2824For the purpose of Article 325azx(1), a change or extension to the use of internal models shall be considered material if it fulfils any of the following conditions:
2825
2826(a) it is an extension which is:
2827(i) an extension of the market risk model to an additional location in another jurisdiction, including extending the market risk model to the positions of a desk located in a different time zone, or for which different front office or IT systems are used;
2828
2829(ii) integration in the scope of an internal model of product classes, for which the ES number, computed according to point (a)(i) of Article 325ba(1), exceeds 5% of the ES number, computed according to point (a)(i) of Article 325ba(1), of the total portfolio forming the scope of that internal model before the integration; or
2830
2831(iii) a reversion in approach where the institution seeks to limit or reduce the scope of application of an IMA permission a permission to use internal models;
2832
2833(b) it is a change which is:
2834(i) a change between historical simulation, parametric or Monte Carlo ES;
2835
2836(ii) a change in the aggregation scheme such as where a simple summation of risk numbers is replaced by integrated modelling;
2837
2838(c) it is a change or extension which results in a change in absolute value of 1% or more, computed for the first business day of the testing of the impact of the extension or change, of one of the relevant risk numbers referred to in point (a)(i) of Article 325ba(1), or point (a)(ii) of Article 325ba(1), or point (a) Article 325ba(2); and associated with the scope of application of the relevant internal models to which the risk number refers; and results in either of the following:
2839(i) a change of 5% or more of the sum of the risk numbers referred to in point (b) of Article 325ba(1), as applicable, computed at the level of the CRR consolidation entity or, in the case of an institution which is neither a parent institution nor a subsidiary, at the level of that institution; or
2840
2841(ii) a change of 10% or more of one or more of the relevant risk numbers referred to in point (a)(i) of Article 325ba(1), point (a)(ii) of Article 325ba(1) or point (a) Article 325ba(2) and associated with the scope of application of the relevant internal models to which the risk number refers.
2842
284301/01/2027
2844
28452.
2846
2847In accordance with Article 325azx(1), an institution shall assess the impact of any change or extension as the highest absolute value over the period referred to in paragraph 3 of a ratio calculated as follows:
2848
2849(a) for the purpose point (c)(i) of paragraph 1 of this Annex:
2850(i) in the numerator, the difference between the sum referred to in point (c)(i) of paragraph 1 with and without the change or extension; and
2851
2852(ii) in the denominator, the sum referred to in (c)(i) of paragraph 1 without the change or extension;
2853
2854(b) for the purposes of point (c)(ii) of paragraph 1 of this Annex:
2855(i) in the numerator, the difference between the risk number referred to in point (a)(i) of Article 325ba(1), point (a)(ii) of Article 325ba(1), or point (a) of Article 325ba(2) with and without the change or extension; and
2856
2857(ii) in the denominator, the risk number referred to, respectively, in point (a)(i) of Article 325ba(1), point (a)(ii) of Article 325ba(1), or point (a) of Article 325ba(2) without the change or extension.
2858
285901/01/2027
2860
28613.
2862
2863For the purposes of point (c)(i) and (c)(ii) of paragraph 1 the ratios referred to in paragraph 2 shall be calculated for a period the duration of which is the shortest between:
2864
2865(a) 15 consecutive business days starting from the first business day of the testing of the impact of the change or extension; and
2866
2867(b) until such day where a daily calculation of either one of the ratios referred to in points (a) or (b) of paragraph 2 results in an impact equal or greater than the percentages referred to in point (c)(i) or (ii) of paragraph 1, respectively.
2868
286901/01/2027
2870
2871Part B Changes and Extensions that require prior notification to the PRA
2872
28731.
2874
2875For the purpose of Article 325azx(3), an institution must give prior notification to the PRA before implementing the following changes and extensions to the use of internal models:
2876
2877(a) the inclusion in the scope of an internal model of product classes requiring other risk modelling techniques than those forming part of the permission to use that internal model, such as path-dependent products, or multi-underlying positions, according to Article 325bh;
2878
2879(b) changes in the fundamentals of statistical methods referred to in the Market Risk: Internal Model Approach (CRR) Part, including but not limited to any of the following:
2880(i) reduction in the number of simulations;
2881
2882(ii) introduction or removal of variance reduction methods;
2883
2884(iii) changes to the algorithms to generate the random numbers;
2885
2886(iv) changes in the statistical method to estimate volatilities or correlations between risk factors; or
2887
2888(v) changes in the assumptions about the joint distribution of risk factors;
2889
2890(c) changes in the effective length of the historical observation period, including a change in a weighting scheme of the time series according to point (c) of Article 325bc(4);
2891
2892(d) changes in the approach for identifying the stressed period according to point (c) of Article 325bc(2);
2893
2894(e) changes in the definition of market risk factors applied in the internal ES model, including migration to an OIS discounting framework, a move between zero rates, par rates or swap rates;
2895
2896(f) changes in how shifts in market risk factors are translated into changes of the portfolio value, such as changes in instrument valuation models - used to calculate sensitivities to risk factors or to re-value positions when calculating risk numbers -, changes from analytical to simulation-based pricing model, changes between Taylor-approximation and full revaluation, or changes in the sensitivity measures applied, according to Article 325bh;
2897
2898(g) changes in the methodology for defining proxies according to paragraphs 13 and 14 of Article 325bh;
2899
2900(h) changes in the hierarchy of sources of ratings used for determining the rating of an individual position in the default risk model according to Section 3 of this Part;