312From the date specified in such permission, the institution shall calculate the own funds requirements using its internal models in accordance with and incorporating the permitted change or extension.
314For the purpose of this paragraph, a change or extension to the use of internal models shall be considered material, if it fulfils any of the conditions set out in Part A of Annex 2.
316When making an application for the permission referred to in this paragraph, an institution shall provide the PRA with the documentation specified in paragraph 1 of Part C of Annex 2.
326(a) in the case of delay of the implementation of that permitted change or extension, the institution shall promptly notify the PRA and present to the PRA a plan for a timely implementation of the permitted change or extension; or
328(b) an institution which fails to implement that permitted change or extension on the date specified in that permission, and which has not notified the PRA in accordance with point (a) of this paragraph must not implement the change or extension and may do so only with the further permission of the PRA, as referred to in paragraph 1.
334An institution must assign changes and extensions to the category of the highest potential materiality for the purpose of determining whether one or more of the materiality thresholds in Part A of Annex 2 is met. An institution must not split an extension or change into several changes or extensions of lower materiality.
340An institution shall notify the PRA of all changes and extensions to the use of the internal models other than those that are material for the purpose of paragraph 1:
346When making a notification in accordance with point (a) of this paragraph, an institution shall provide the PRA with the documentation specified in paragraph 2 of Part C of Annex 2. An institution shall notify the PRA promptly if, having notified the PRA of a change or extension in accordance with point (a) of this paragraph, it decides not to implement the extension or change.
356An institution using an internal model shall calculate the own funds requirements for the portfolio of all positions assigned to the trading desks for which the institution has been granted an IMA permission as the higher of:
364(i) the average of the institution's daily expected shortfall risk measure, calculated in accordance with Article 325bb for each of the preceding 60 business days (ESavg), multiplied by the multiplication factor (mc); and
366(ii) the average of the institution's daily stress scenario risk measure, calculated in accordance with Article 325bk for each of the preceding 60 business days (SSavg).
372An institution which holds positions in traded debt and equity instruments that are included in the scope of the internal default risk model and assigned to the trading desks referred to in paragraph 1 shall fulfil an additional own funds requirement, expressed as the higher of the following values:
382For the purpose of point (a) of paragraph 1, and in accordance with the back testing requirements and P&L attribution requirements, an institution shall calculate the total own funds requirements for all its trading book positions and all its non-trading book positions generating foreign exchange or commodity risks as the sum of the results of formulas (a) and (b) as follows:
392the own funds requirements calculated in accordance with this Article for the portfolio of all positions assigned to trading desks that meet the requirements set out in Article 325bf(3) for the preceding 12 months and have been classified as green or yellow desks among those in accordance with Article 325bg and for which the institution calculates the own funds requirements in accordance with this Part;
396the own funds requirements calculated in accordance with the Market Risk: Advanced Standardised Approach (CRR) Part for the portfolio of all positions assigned to trading desks that meet the requirements set out in Article 325bf(3) for the preceding 12 months and have been classified as green zone or yellow zone trading desks among those in accordance with Article 325bg and for which the institution has permission to calculate the own funds requirements using internal models in accordance with this Part;